Business removals

Office & IT Relocation in London

A fully insured, fully managed office move across London and the M25. From a single studio office to a multi-floor headquarters, we plan the move around your business, not the other way round, and get you working again fast.

5.0 on Google

Real reviews from London customers

Fully insured

Goods in Transit
& CMR cover

12+ years

Moving London
since 2013

Licensed carrier

Registered with the
Environment Agency

What it is

What office and IT relocation means

Office and IT relocation is a managed service that moves an entire business from one premises to another, covering both the physical office and the technology that runs it. On the office side, this includes desks, chairs, partitions, filing, storage and reception areas.

 

On the IT side, it covers the careful decommissioning, transport and reconnection of servers, workstations, network hardware and communications, so the business can switch off in one location and switch on in the next. Unlike a residential move, a commercial relocation is planned around business continuity: the goal is to lose as little working time as possible, which is why much of the work happens out of hours or over a weekend. It also involves access that homes rarely have, such as goods lifts, loading bays and building management sign-off. This service sits within our wider range of removals services in London, alongside residential moves and international relocations.

How it works

How your office move is planned and delivered

A project, not just a van. Every commercial move runs to a plan agreed with you in advance.

STEP 01

Site survey and move plan

We visit both premises, assess volume, access, lifts and IT, and agree a written move plan and timeline with your team.

STEP 02

Inventory and labelling

Everything is inventoried and labelled by destination, desk and department, so nothing is lost and unpacking is fast.

STEP 03

IT decommission

Servers, workstations and comms are shut down, disconnected and packed by hand, with cabling logged for a clean reconnection.

STEP 04

Out-of-hours transport

The move runs in the evening or over a weekend where possible, so your team returns to a working office.

STEP 05

IT recommission and setup

Hardware is reconnected, powered up and checked, and furniture is rebuilt in the agreed floor plan.

STEP 06

Final check and sign-off

We walk the new space with you, clear the packaging, and only close the job once you confirm everything works.

What is included

Everything an office move can include

When you need it

Business moves we handle

Every relocation has a different reason behind it. These are the ones we plan most.

Moving to a new office

Relocating premises across London, with lease dates and building access to coordinate at both ends.

Server or data room move

Relocating critical hardware where careful handling, sequencing and reconnection matter most.

Expanding or downsizing

Growing into a larger space or consolidating into a smaller one, often with furniture and IT to add or clear.

Refurbishment or internal move

Shifting teams between floors or clearing a space for building work, then moving back in.

Access and timing

Planned around your building and your working hours

Commercial buildings come with access that residential moves rarely face: booked goods lifts, loading docks with time windows, security sign-in and building management approval. We handle these arrangements as part of the plan, and we schedule the physical move for evenings or weekends wherever possible so your team loses as little trading time as possible.

We sort the parking and loading access

Many London commercial streets need a bay suspension or dispensation before a large vehicle can load, and the process takes several working days. We arrange this alongside the building booking. See how it works on our London parking and bay suspension guide.

Why EUROBR

A move that keeps your business running

Minimal downtime

Out-of-hours and weekend moves so you return to a working office, not a warehouse of boxes.

Fully insured, IT included

Goods in Transit and CMR cover on furniture and technology alike.

One coordinated team

A single move coordinator and a trained crew, not a rotating cast of agency drivers.

FAQ

Office and IT relocation: common questions

The cost of an office relocation in London is not a fixed figure, because it depends on the scale and complexity of the move rather than a single rate. The main factors are the size of the office and the number of staff, the total volume of furniture and equipment, the amount and sensitivity of IT hardware, the distance between the two premises, and the access at each end, including lifts, loading bays and floor levels. Timing matters too, as out-of-hours and weekend moves are priced differently from a standard working day. Extra services such as crate hire, IT decommissioning, storage or furniture disposal also shape the total. Because of this, a credible price comes from a site survey rather than a headline number, so the mover can see the real conditions of both buildings. Planning early also helps, since rushed moves cost more. For a fuller view of what drives a price, our guide to moving costs in London breaks down each factor and how to budget for a commercial relocation.

The duration of an office move depends on size, but the working principle is the same for most businesses: keep operational downtime as close to zero as possible. A small office can often be moved over a single evening or weekend, while a large or multi-floor site may need several phases. Downtime is reduced through planning rather than speed alone. A written move plan sequences the work so that IT is the last thing disconnected at the old site and the first thing reconnected at the new one, which is where lost time usually hides. Labelling everything by desk and department means teams find their equipment immediately instead of searching through unmarked boxes. Running the physical move out of hours means staff leave one office on Friday and arrive at a working one on Monday. Clear responsibilities on your side, such as who backs up systems and who signs off access, also prevent delays. Our moving checklist sets out a timeline that helps a business prepare in the right order.

Yes, IT relocation is a core part of a commercial move, and it is the part that needs the most care. It covers workstations, monitors and peripherals, network hardware such as switches and routers, communications equipment, and where present, servers and data room infrastructure. The process is methodical: hardware is shut down in a controlled sequence, disconnected, and cabling is logged so it can be rebuilt exactly at the new site. Items are packed by hand in appropriate materials rather than loose in crates, because vibration and static are real risks for electronics in transit. At the destination, equipment is reconnected, powered up and checked before the job is signed off. Sensitive or business-critical hardware, particularly servers, is usually scheduled as its own phase so it can be handled without pressure. Responsibility for data backups normally stays with the client or their IT provider, which is worth agreeing in the plan. This service can be booked alongside a full office move or as a standalone IT relocation.

Yes, and for most businesses it is the preferred option. Moving in the evening, overnight or across a weekend means the relocation happens while the office is empty and trading has stopped, so staff return to a space that is already set up. This is usually the single biggest factor in reducing lost working time. Out-of-hours moves do require coordination beyond the move itself: many commercial buildings restrict access times, require a booked goods lift, and need security or building management to authorise entry, all of which are arranged in advance as part of the plan. Parking and loading permissions in London also have to be organised ahead, since a bay suspension can take several working days to approve. Because these moves fall outside standard hours, they are scheduled carefully rather than at short notice. The trade-off is straightforward: a little more planning in exchange for a business that barely feels the disruption. Our London parking and bay suspension guide explains the access side in detail.

With a professional mover, office contents are normally protected in transit, but cover has limits and conditions, so the terms are worth understanding. The industry standard is Goods in Transit insurance, which protects items while they are being carried, together with CMR cover for any international road transport. This applies to furniture and to IT hardware alike. It is important to separate two things: physical hardware and the data on it. Transit insurance covers damage to or loss of the equipment itself, but the information stored on servers and computers is a separate responsibility, which is why backing up data before the move should sit with the client or their IT provider. Informal operators sometimes carry no cover at all, a real risk when expensive equipment is involved. Before booking, it is reasonable to ask a mover to confirm their insurance in writing and to read the policy. EUROBR publishes its cover openly, and the paperwork behind international transport is explained on the CMR regulations page.

Good preparation is what keeps an office move on schedule. A few things make the biggest difference. First, appoint a single internal point of contact who can make decisions and coordinate with the move team, which prevents conflicting instructions on the day. Second, confirm the dates and access at both buildings early, including lease handover, lift bookings and security, since these often have lead times. Third, ensure IT systems are backed up before anything is disconnected, as transit insurance covers hardware but not the data on it. Fourth, ask staff to clear and label their own desks and personal items, which speeds up both packing and unpacking. Finally, decide what is moving and what is being disposed of or recycled, so old furniture and equipment are not transported unnecessarily. Agreeing a floor plan for the new office in advance also means furniture and IT go straight to the right place. Our moving checklist provides a step-by-step timeline a business can follow in the weeks before the move.

Relocating your office in London? Get a clear plan and price

Tell us the size of your office and both addresses, and we come back with a move plan and a fixed, no obligation quote.

plugins premium WordPress